Welcome: Mitob Technology Co.,Ltd
kevin@mitobcable.com 0086-18823374992

Industry news

Testing and Verification after Installing J1939 to J1708 Cable

Testing and Verification after Installing J1939 to J1708 Cable

Communication function test

J1939 end: Use a CAN analyzer to send/receive messages and verify the correctness of PGN (parameter group number) and SPN (suspicious parameter number).

J1708 end: Check the integrity of MID (message ID) and data frames through a diagnostic instrument or oscilloscope.

Example: Send J1939 message and confirm that J1708 can correctly parse and display it.

Error rate and stability monitoring

Error rate: Run continuously for 24 hours and calculate the error rate.

Stability: Simulate environments such as vibration and high temperature, and observe whether communication is interrupted or data is abnormal.

3.jpg

Troubleshooting

Common problems: Loose connectors, ungrounded shielding layer, missing terminal resistance, cable damage, etc.

Tool recommendation: Use a multimeter (to measure resistance/voltage), oscilloscope (to measure waveform), and CAN analyzer (to measure message) for diagnosis.


CATEGORIES

CONTACT US

Contact: Kevin

Phone: 0086-18823374992

E-mail: kevin@mitobcable.com

Whatsapp:

Add: Bld B2, Floor7 , Xinghe Zhongkai AI Industrial Park, Zhongkai High-tech Zone, Huizhou,China